15.07.2025.
Supply of equipment necessary for establishing Integrated Administration and Control System (IACS) (I phase)
Referenca:
EC-NEAR/BEG/2025/EA-OP/0003Datum otvaranja:
13. maj 2025.Datum zatvaranja:
18. jul 2025.13.05.2025.
13.05.2025.
13.05.2025.
15.07.2025.