17.10.2025.
Development of the Operational Integrated Administration and Control System (IACS) (I phase) in line with EU CAP requirements
Referenca:
EC-NEAR/BEG/2024/EA-RP/0157Datum otvaranja:
07. novembar 2024.Datum zatvaranja:
13. decembar 2024.07.11.2024.
07.11.2024.
03.12.2024.
17.10.2025.