17.10.2025.
Development of the Operational Integrated Administration and Control System (IACS) (I phase) in line with EU CAP requirements
Reference:
EC-NEAR/BEG/2024/EA-RP/0157Opening date:
07. November 2024.Closing date:
13. December 2024.07.11.2024.
07.11.2024.
03.12.2024.
17.10.2025.